A short post today just listing the tasks that were started or completed.
  • Filled in APEX block around the big beam up to 8 courses.
  • Cut all the remaining window bucks for the 2nd story.
  • Assembled all but one window buck.
  • Cut and installed vertical rebar in APEX cores under 2nd story window locations.
  • Planed and sanded two 4X10 ledgers.
  • Shored up the south wall in preparation for installing 2nd story window bucks.
  • Installed one window buck.
  • Drilled holes in one of the ledgers for J-bolt attachments to the wall.
  • Drilled 5 inch diameter holes in the West kitchen wall to form concentric concrete cylinders around each J-bolt during the next grout lift.
Here is a pic at the end of day 31. The 2nd story is starting to take shape.