- Filled in APEX block around the big beam up to 8 courses.
- Cut all the remaining window bucks for the 2nd story.
- Assembled all but one window buck.
- Cut and installed vertical rebar in APEX cores under 2nd story window locations.
- Planed and sanded two 4X10 ledgers.
- Shored up the south wall in preparation for installing 2nd story window bucks.
- Installed one window buck.
- Drilled holes in one of the ledgers for J-bolt attachments to the wall.
- Drilled 5 inch diameter holes in the West kitchen wall to form concentric concrete cylinders around each J-bolt during the next grout lift.
Thanks for reading. Please feel free to leave a comment.