Towards the end of the day, we lifted the 450 pound beam into place. Here is a pic of Justin, Rafael, Georg, Trevor and Joshua at the half way rest point.
Joshua stretching out his back after we seated the fabulous looking beam.
It was level - nice work on those beam seats Justin! It was such a great feeling of accomplishment seeing the beam in place. At the same time it was humbling to place something that will be there long after I am gone.
Some other tasks today:
- Completed the 8th course of APEX block as far as possible before seating of the beam.
- Started digging a trench for the utility room electrical connection.
- Began sanding a 4X10 inch beam.
- Finished stacking APEX blocks and trimming rebar in the utility room.
Thanks for reading. I appreciate your comments.