- All window and door bucks on the 1st floor were built, and all but one were installed. It is exciting to see the window views appear.
- The 3rd course of APEX block was installed all the way around the home, and part way around the utility room.
- The concrete slab was rinsed one last time. Protective material was placed over the slab. Vapor barrier film was placed over the great room floor, and a lightweight cardboard material was placed over the bedroom, bathroom and closet floors. It is expected that these 2 different materials will create different finish stain patterns in the concrete. It will be interesting to see the results later. Here is a pic from the east at the end of day 25.