The folks from
Independent Energy Systems began installing the
PV solar panel racks on the roof - pic 1 below. They also installed the
inverter (left) in the utility room next to the
main distribution panel (right) - pic 2 below.


Joshua poured
mortar on the shower floor and created a surface that tapers down slightly from the outside edges to the drain.

We completed applying
masking tape and plastic sheet around the perimeter of the building in preparation for interior plastering. Thanks for reading. Please feel free to leave a comment.
1 comment:
mike, is it true that you and cindy are inseparable? i thought she'd hate you by now.
Post a Comment