I’m running late tonight after a very busy day. Here is a list of the things that happened Thursday.
- Had a successful interior gypsum plaster test in the closet
- Indirect water heater was delivered
- Shower floor was leveled
- Hung the entry door and 2 interior doors
- Finished applying masking tape and plastic sheet to all exterior windows and sliding patio doors
- Rinsed the exterior of the east and north walls in preparation for plastering Friday
Following is a pic of the entry door. Thanks for reading. Please feel free to leave a comment.
No comments:
Post a Comment