Thursday, October 1, 2009

Day 93: Ubiquitous plaster preparation and other tasks

I’m running late tonight after a very busy day. Here is a list of the things that happened Thursday.
  • Had a successful interior gypsum plaster test in the closet
  • Indirect water heater was delivered
  • Shower floor was leveled
  • Hung the entry door and 2 interior doors
  • Finished applying masking tape and plastic sheet to all exterior windows and sliding patio doors
  • Rinsed the exterior of the east and north walls in preparation for plastering Friday
Following is a pic of the entry door. Thanks for reading. Please feel free to leave a comment.

No comments: