Tuesday, September 29, 2009

Day 91: Plaster preparation and shower enclosure

In the continuing saga of plaster preparation, Trevor started to set up scaffolding along the south and west walls. I applied masking tape and plastic sheet to the interior of all windows and all doors except one.

Trevor and Raphael installed HardieBacker 500 board to the shower enclosure. This material will support the shower tiles. Below is a pic looking at the south and west walls of the enclosure. Thanks for reading. Please feel free to leave a comment.