Sunday, September 13, 2009

Day 79: Drainage and insulation prep

Here is a pic of Trevor and Steve on Friday installing the downspout drainage line along the west wall.

The folks from Tri County Insulation hung plastic sheet inside to protect the windows, walls and beams when insulation is blown into the ceiling next week. It gives the place an eerie slasher movie kinda feel.

Raphael cut channels in the north wall to run solar water heating and photovoltaic conduits and pipes between the roof and utility room.

With Steve on site, Gabby is never far away. Thanks for reading. Please feel free to leave a comment.

No comments: