Other tasks from day 66:
- Trevor completed digging the trench to connect the main power to the utility room
- Erik and Ryan continued to install electrical wiring
- Tim and Carlos started installing the fire sprinkler system
- The folks from Wildcat Metals were back again to install gutters on the main home. Here is a pic of the south wall of the home.
No comments:
Post a Comment