Day 63: More windows and electrical wiring

We installed 10 windows and 1 sliding glass patio door today. One window and 2 sliding glass doors remain. Here is a pic of Marty and Justin getting ready to install the picture window in the east wall of the loft – Trevor is driving the telehandler.



In between window installations, Erik the electrician had me position electrical wiring boxes in their final locations. Erik’s assistant Ryan used a router to cut channels in the walls connecting switch boxes to wall socket boxes. Ryan also began running Romex power cable between the boxes.

Justin made a nice freehand sawzall cut to the cantilevered end of the porch beam.

Stella status:
She was looking much better today – the swelling from the sting in her cheek was gone. Thanks for reading. Please feel free to leave a comment.