
Alan continued to install the kitchen and vanity cabinets on Thursday and Friday while I started laying out plumbing for the heating system in the utility room. Thanks for reading. I appreciate your comments.
...searching for myself...searching for land...designing, building and living in a green home...

Marty, Georg and I installed downspouts. Here is a pic of the souteast corner.
I finally removed all of the tarps protecting the south wall lime plaster while it dried. Below is a pic of that wall from the southwest. Thanks for reading. Please feel free to leave a comment.

On Tuesday, Joshua started working on the shower floor. I continued spraying the downspouts with saltwater. Erik stopped by and installed a few outdoor lights and outlets. Below is a pic of the entry porch lights at night. Thanks for reading. I appreciate your comments.
Here is a pic of the kitchen peninsula cabinets from Live Oak Design in process.
I'll close with a pic of Joshua's shower tiling in process, WOW! Thanks for reading. I appreciate your comments.

Joshua continued installing tile in the shower. Thanks for reading. I appreciate your comments.
Marty installed copper downspouts between the gutters and drains. Here is a pic of the downspout on the northwest corner of the home.
Other tasks from day 110:
Justin, Marty, Raphael, Georg and I installed corrugated metal soffit material around the perimeter of the home. We are pleased with the results. Here is a pic of the northwest corner soffit.
Green comments for today:
Trevor and I did a bit of site cleanup while Joshua applied waterproofing to the shower floor. We pulled the masking tape and plastic protecting the soffit area to reveal our plaster work up top. We are pleased with the results. Below is a pic of the northwest corner and porch area (please ignore the temporary downspouts). Thanks for reading. I appreciate your comments.
I’ll close with a pic of me in front of the west wall near the end of day 105. Thanks for reading. Please feel free to leave a comment.
Marty applied and knocked down ceiling texture while Trevor, Raphael and I shuffled scaffolding around. Between the rain this week and the water evaporating from the plaster, the house is humid like Florida. Below is a pick of Marty up top with Trevor and Raphael below. Thanks for reading. I appreciate your comments.
Green comment for today:
Thanks for reading. Please feel free to leave a comment.
The guys from Independent Energy Systems were back again today to install another rack for the photovoltaic array. Thanks for reading. I appreciate your comments.
Here is a pic of Cindy in the dining room on Saturday after the wall has partially dried.
Here is a closeup pic of the kitchen window bullnose. This detail gives the house a nice old-world feel. Thanks for reading. I enjoy reading your comments.