Marty installed copper downspouts between the gutters and drains. Here is a pic of the downspout on the northwest corner of the home.
Other tasks from day 110:
- Erik the electrician continued installing outlets, switches and light fixtures
- Joshua began installing tile in the shower
- I started cutting salvage railing pieces to fit the edge of the loft
No comments:
Post a Comment