Showing posts with label downspouts. Show all posts
Showing posts with label downspouts. Show all posts

Wednesday, November 11, 2009

Day 120: Shower floor and downspouts

On Wednesday, Joshua continued work on the shower floor tiles. All of the material used for tiling the shower is leftover scraps from local kitchen countertop fabricators. Joshua's art is to cut the stone and create a beautiful tile mosaic with the pieces. Here is a pic of the work in progress.

Marty, Georg and I installed downspouts. Here is a pic of the souteast corner.

I finally removed all of the tarps protecting the south wall lime plaster while it dried. Below is a pic of that wall from the southwest. Thanks for reading. Please feel free to leave a comment.

Wednesday, October 28, 2009

Day 110: Spiral staircase and downspouts

On Wednesday, we installed the spiral staircase that was made by Stocklin Iron in Santa Rosa, CA. Here is a pic of the staircase taken from the dining room.

Marty installed copper downspouts between the gutters and drains. Here is a pic of the downspout on the northwest corner of the home.

Other tasks from day 110:
  • Erik the electrician continued installing outlets, switches and light fixtures
  • Joshua began installing tile in the shower
  • I started cutting salvage railing pieces to fit the edge of the loft
Thanks for reading. Please feel free to leave a comment.

Friday, August 21, 2009

Day 70 and 71: Metal roof completion and plaster experiments

The folks from Wildcat Metals were back Thursday and Friday. They completed installation of the roof panels and drilled holes in the rain gutters for downspouts. Here is a pic of the completed main roof…

…and one of the utility and porch roof. I am very happy with the appearance.

On Thursday, Joshua, Justin, Georg and I tried unsuccessfully to shoot Natural Hydraulic Lime plaster (NHL 3.5) from 2 different air powered spray guns. Joshua ended up troweling the material onto the north exterior wall around the bathroom window.

On Friday, Joshua and I mixed NHL 5 plaster and troweled it onto the east and northeast exterior walls. The material spread well and appeared to adhere well to the wall. More to come next week on how crack-free the plaster cures. Here is a pic from around the bathroom window.

Coady and Adam completed the rough plumbing on Thursday.

Green comment for today:
Consider a standing seam metal roof as an alternative to asphalt shingles. A metal roof is more expensive, but can last 5 times longer than shingles. Metal is 100% recyclable when it comes time for replacement. A metal roof is also more energy efficient in climates that require air conditioning.

Thanks for reading. I enjoy your comments.