Wednesday, November 11, 2009

Day 120: Shower floor and downspouts

On Wednesday, Joshua continued work on the shower floor tiles. All of the material used for tiling the shower is leftover scraps from local kitchen countertop fabricators. Joshua's art is to cut the stone and create a beautiful tile mosaic with the pieces. Here is a pic of the work in progress.

Marty, Georg and I installed downspouts. Here is a pic of the souteast corner.

I finally removed all of the tarps protecting the south wall lime plaster while it dried. Below is a pic of that wall from the southwest. Thanks for reading. Please feel free to leave a comment.

Tuesday, November 3, 2009

Day 114: Plastering completed

On Tuesday, Joshua, Trevor, Marty, Raphael, Georg and I applied the finish coat of lime plaster to the exterior of the south wall. This was a monumental day being the completion of plastering on the home. Below is a pic of Raphael, Marty, me and Joshua at the southwest corner. You can see that everyone’s clothing has taken on a yellow tinge. Thanks for reading. I appreciate your comments.

Monday, November 2, 2009

Day 112 & 113: Exterior plaster

On Friday, Joshua, Trevor, Marty, Raphael and I applied the finish coat of lime plaster to the exterior of the east, west and utility room walls. On Monday the same crew applied the finish coat of plaster to the exterior of the north wall. The plaster has an integrated mineral tint, so painting is not required. I think the color and finish are beautiful. Below is a pic of the west (right) and north (left) walls. Thanks for reading. I enjoy reading your comments.

Thursday, October 22, 2009

Day 106: Exterior plastering…and solar panels

On Thursday, we applied the 2nd of 3 coats of lime plaster to the south wall.

The guys from Independent Energy Systems installed 22 Sharp 224 watt solar panels to the tilt racks on Tuesday - I totally forgot to take a picture. Below is a pic of the south wall showing the plaster and solar panels. Thanks for reading. I enjoy reading your comments.

Wednesday, October 21, 2009

Day 104 an 105: Exterior plastering

Monday we had the day off because of rain. On Tuesday, we applied the 2nd of 3 coats of lime plaster to the exterior of the east and west walls. This is called the straightening coat because the plasterers try to straighten out imperfections in the wall in preparation for the finish coat. I worked until 8:30 PM on this coat, so I didn't post Tuesday.

On Wednesday, we applied the 2nd of 3 coats of lime plaster to the exterior of the north wall. The final step is to scratch the coat to provide a mechanical key for the finish coat to latch onto. Here is a pic of the southwest corner of the home. Notice the difference between the horizontal scratched lines on the west wall (left) and the bumpy texture of the scratch coat on the south wall (right).

I’ll close with a pic of me in front of the west wall near the end of day 105. Thanks for reading. Please feel free to leave a comment.

Tuesday, October 6, 2009

Day 96: West and north wall plastering

Today we applied the first of three lime plaster coats to the exterior of the west and remainder of the north wall. Thanks to Trevor, Raphael, Joshua, Ben, Georg and Justin for helping complete the first coat of exterior plaster in 3 days. Here is a pic of the northwest corner of the home.

Some other tasks from day 96:
  • I planed and sanded more of the reclaimed tongue and groove redwood flooring for use as casing molding. I ripped off about one inch from the tongue side of the boards.
  • Justin installed the casings around the exterior of the utility room and entry doors. The groove will hold the plaster in place next to the molding.
  • Installed 2X4 boards in the kitchen wall to support cabinets
  • Installed extensions on the bottom of the window bucks inside to: 1) control the thickness of plaster on the wall next to the windowsill (plaster screed), 2) support the windowsill and 3) act as a support for the apron under the windowsill
  • Started cutting and installing diamond mesh metal lath to the interior wall top plate
Stella status:
She is still growing, and her bark has gotten deeper. I caught her napping this afternoon. Thanks for reading. I appreciate your comments.

Monday, October 5, 2009

Day 95: South wall plastering

Today we applied the first of three lime plaster coats to the exterior of the south wall. This is known as a scratch coat. It has this name because it is usually scratched while still wet to create grooves for the next coat to latch onto. We do not have to scratch the plaster because the sprayer leaves a nice bumpy surface for the next coat. Thanks to Trevor, Raphael, Joshua, Georg and Ben for making the day go smoothly. Here is a pic of the plaster next to a sliding patio door.

We also installed the utility room door today.

I’ll close with a couple pics of Trevor’s daughter Zephyra showing her plastering technique. She visited today with mom and grandma. Thanks for reading. I enjoy reading your comments.


Sunday, October 4, 2009

Day 94: Exterior plaster

On Friday we applied the first of three lime plaster coats to the exterior of the east wall and part of the north wall. Here are pics of both walls respectively. Thanks for reading. I appreciate your comments.


Wednesday, September 30, 2009

Day 92: Drywall joint compound and plaster preparation

The Consolidated Drywall folks applied joint compound to the drywall seams, screws and electrical box openings. Here is a pic looking east from the kitchen.

More plaster preparation tasks completed today:
Thanks for reading. I appreciate your comments.