On Monday, Joshua completed installing tile on the shower walls while I cut triangular tile pieces for the shower floor. I
sprayed salt water on the copper downspouts to
accelerate
patina development. Here is a pic of the southwest shower corner followed by a pic of the downspouts.


On Tuesday, Joshua started working on the shower floor. I continued spraying the downspouts with saltwater. Erik stopped by and installed a few outdoor lights and outlets. Below is a pic of the entry porch lights at night. Thanks for reading. I appreciate your comments.