Joshua, Justin and I ran a successful test of a
Tirolessa plaster gun on Friday. We shot the northeast corner wall with a coat of
NHL 3.5 lime plaster from
Saint Astier. Here is a vid of the gun in action.
Steve completed final grading around the home on Friday and Monday. Here is a pic of the home from the southwest.

Some of the other tasks started or completed Friday and Monday:
- Trevor waterproofed the utility room retaining wall built Thursday
- Justin and I completed application of weatherproofing on all windows
- Joshua and I installed diamond mesh metal lath to the exterior of several more windows
- I trimmed excess foam insulation around the interior of several windows
- Erik completed all rough electrical wiring inside the home
- Marty and Trevor filled slots containing electrical wiring and plumbing pipes with mortar to provide a uniform surface for plastering
- Justin and Marty installed a vent pipe for the bathroom ventilation fan
I’ll close with a pic of Cindy cutting down
scotch broom with her new electric hedge trimmer over the weekend. Thanks for reading. Please feel free to comment.