Day 98: Solar install, shower and final preparations for interior plastering

The folks from Independent Energy Systems began installing the PV solar panel racks on the roof - pic 1 below. They also installed the inverter (left) in the utility room next to the main distribution panel (right) - pic 2 below.


Joshua poured mortar on the shower floor and created a surface that tapers down slightly from the outside edges to the drain.

We completed applying masking tape and plastic sheet around the perimeter of the building in preparation for interior plastering. Thanks for reading. Please feel free to leave a comment.

Tuesday, September 22, 2009

Day 86: More plaster preparation

I worked late today, so I am just posting a quick list of what was done.
  • Joshua completed installation of diamond mesh metal lath to the exterior of all windows, and to the interior of one window
  • I installed spray foam insulation around the interior of several 2nd story windows
  • Trevor continued to fill the slots containing electrical wiring and plumbing pipes with mortar
  • Marty tested spraying drywall joint compound and veneer plaster on the interior walls. More to come before the final decision on an interior finish.
Thanks for reading. I enjoy reading your comments.

Monday, September 21, 2009

Day 84 & 85: Final grading and plaster preparation

Joshua, Justin and I ran a successful test of a Tirolessa plaster gun on Friday. We shot the northeast corner wall with a coat of NHL 3.5 lime plaster from Saint Astier. Here is a vid of the gun in action.



Steve completed final grading around the home on Friday and Monday. Here is a pic of the home from the southwest.

Some of the other tasks started or completed Friday and Monday:
  • Trevor waterproofed the utility room retaining wall built Thursday
  • Justin and I completed application of weatherproofing on all windows
  • Joshua and I installed diamond mesh metal lath to the exterior of several more windows
  • I trimmed excess foam insulation around the interior of several windows
  • Erik completed all rough electrical wiring inside the home
  • Marty and Trevor filled slots containing electrical wiring and plumbing pipes with mortar to provide a uniform surface for plastering
  • Justin and Marty installed a vent pipe for the bathroom ventilation fan
I’ll close with a pic of Cindy cutting down scotch broom with her new electric hedge trimmer over the weekend. Thanks for reading. Please feel free to comment.

Monday, August 24, 2009

Day 72: Details

Tasks completed or started today.
  • Joshua coated the interior exposed wood on all but 1 window with 2 coats of AFM Safecoat Naturals Clear Penetrating Oil - a low VOC sealer that will protect the wood. The windows really look nice.
  • The folks from Wildcat Metals installed trim and flashing material.
  • Trevor applied mortar to the seams between Apex blocks that will be underground.
  • Justin put the finishing touches on the framing in the bedroom, closet and bathroom.
  • Erik returned from summer vacation and continued rough electrical work.
Stella status: