The folks from Independent Energy Systems began installing the PV solar panel racks on the roof - pic 1 below. They also installed the inverter (left) in the utility room next to the main distribution panel (right) - pic 2 below.
Joshua poured mortar on the shower floor and created a surface that tapers down slightly from the outside edges to the drain.
We completed applying masking tape and plastic sheet around the perimeter of the building in preparation for interior plastering. Thanks for reading. Please feel free to leave a comment.