- Trevor continued filling electrical and plumbing channels in the walls to provide a level surface for plastering
- Joshua continued applying diamond mesh metal lath to the interior windows
- I completed applying foam insulation to cracks and holes in the walls
- Trevor applied masking tape and plastic sheet to the northeast corner windows to keep plaster off the glass and frames
- Trevor installed a metal door and frame over the fire sprinkler valve on the north wall
- Trevor removed soil from the east wall to a point approximately 6 inches below the final grade