Some of the other tasks started or completed today:
- In preparation for plastering, Joshua cut and installed pieces of diamond mesh metal lath to the exterior of several windows.
- Justin applied weatherproofing to several second story windows
- I applied foam insulation around the interior of several windows
- Alan Dodd of Live Oak Design delivered beautiful doors for the bedroom, bathroom, closet and entry. Alan is also building the kitchen cabinets. All of the wood used is FSC certified.
- Erik installed some Cat5 cables and began working on a conduit to run audio wiring from the north to the south side of the family room
- Trevor waterproofed the southwest retaining wall we built yesterday
- Trevor built a small retaining wall on the northwest corner of the utility room. The retaining walls were built from leftover pieces of APEX block.