On Wednesday, Joshua continued work on the shower floor tiles. All of the material used for tiling the shower is leftover scraps from local kitchen countertop fabricators. Joshua's art is to cut the stone and create a beautiful tile
mosaic with the pieces. Here is a pic of the work in progress.

Marty, Georg and I installed
downspouts. Here is a pic of the souteast corner.

I finally removed all of the tarps protecting the south wall
lime plaster while it dried. Below is a pic of that wall from the southwest. Thanks for reading. Please feel free to leave a comment.
No comments:
Post a Comment