On Thursday, Steve did final site grading. All of the walls have been backfilled with soil to the final height, and surface storm water drainage paths are complete all around the home. Here is a pic of the east wall showing final grading to compare with yesterday's pic.

Here is a pic of the kitchen peninsula cabinets from
Live Oak Design in process.

I'll close with a pic of Joshua's shower tiling in process, WOW! Thanks for reading. I appreciate your comments.
No comments:
Post a Comment