- Provide proper spacing and support for the rafters
- Provide a location to fasten the roof structure to the wall top plate
- Provide a mounting surface for plywood roofing material
- Create a boundary to enclose the ceiling insulation
...searching for myself...searching for land...designing, building and living in a green home...

Excessive dirt was scraped off with a putty knife.
The boards were run through a planer to remove about 1/32 inch.
The tongues and grooves were scraped and brushed clean so that the boards will fit well together.
Finally, the boards were sanded with 120 grit sandpaper.
It was very rewarding seeing the grain and patterns pop out when the old weathered material was removed. The wood has a very tight grain pattern - new redwood material like this cannot be purchased anymore. Here is a pic of the same 4 boards after preparation.
On Monday, we prepared 16 rafters over the loft with an eave support detail. This included notching the I-joists and fastening plywood spacers and 2X4 stiffeners. We fastened these rafters to the hangers on the curved glulam beam and set them in approximately the correct locations on the east top plate. Here is a pic looking east towards the loft from the kitchen at the end of day 52.
Stella status:
Thanks for reading. I appreciate your comments.

Green comment for today:
Thanks for the lift Trevor!