Showing posts with label planer. Show all posts
Showing posts with label planer. Show all posts

Tuesday, August 25, 2009

Day 73: Hanging a ledger and more details

Today Justin planed and sanded the last 4X10 ledger. Justin, Trevor and I hung the ledger on the shear wall.

Other tasks from day 73:
  • Trevor installed pipe in the footing trench around the perimeter of the home. Garden hose valves and future irrigation lines can tee into this pipe.
  • I installed waterproofing tape around the exterior of the 1st story window openings. This layer helps protect the window framing if water gets behind the exterior plaster.
  • Justin installed drip caps on the 2 small sliding patio doors. This piece of sheet metal directs water away from the top of the door.
Thanks for reading. I enjoy reading your comments.

Monday, July 27, 2009

Day 52: Reclaimed redwood and more rafters

When I visited Heritage Salvage in Petaluma a few weeks ago, I picked up several hundred square feet of reclaimed redwood tongue and groove flooring material. On Saturday and Sunday, Cindy and I prepared this wood for attachment to the small curved glulam beams. When you look up while on the porch or in the utility room, you will see these boards. Here is a pic of 4 boards before preparation - gray, weathered and dirty.

Excessive dirt was scraped off with a putty knife.

The boards were run through a planer to remove about 1/32 inch.

The tongues and grooves were scraped and brushed clean so that the boards will fit well together.

Finally, the boards were sanded with 120 grit sandpaper.

It was very rewarding seeing the grain and patterns pop out when the old weathered material was removed. The wood has a very tight grain pattern - new redwood material like this cannot be purchased anymore. Here is a pic of the same 4 boards after preparation.

On Monday, we prepared 16 rafters over the loft with an eave support detail. This included notching the I-joists and fastening plywood spacers and 2X4 stiffeners. We fastened these rafters to the hangers on the curved glulam beam and set them in approximately the correct locations on the east top plate. Here is a pic looking east towards the loft from the kitchen at the end of day 52.

Stella status:
She is getting bigger every day, but is still mostly paws and ears attached to a nose.

Thanks for reading. I appreciate your comments.