Tuesday, November 10, 2009

Day 118 & 119: Shower, downspouts and electrical

On Monday, Joshua completed installing tile on the shower walls while I cut triangular tile pieces for the shower floor. I sprayed salt water on the copper downspouts to accelerate patina development. Here is a pic of the southwest shower corner followed by a pic of the downspouts.


On Tuesday, Joshua started working on the shower floor. I continued spraying the downspouts with saltwater. Erik stopped by and installed a few outdoor lights and outlets. Below is a pic of the entry porch lights at night. Thanks for reading. I appreciate your comments.

2 comments:

local hamptonite said...

where are the outdoor lights from? we need some new ones too & those are nice. :)
love the birthday girl!

Mike said...

Hey birthday girl,

The lights are from:

http://www.johnsonartstudio.com/index.htm

Hope you had an excellent B-day!

Mike