On Monday, Joshua started applying grout between the shower tiles. The pic below shows a portion of the south shower wall with grout completed. As awesome as the shower looked on Friday, it looks even better today with grout.
Alan applied Osmo Polyx-Oil finish to kitchen cabinet doors. I continued working on the water and space heating system in the utility room. Thanks for reading. I enjoy reading your comments.
gone but not Blogotten
-
Testing 123
bug in the air is wondering where
this blog lives if any where there?
this cowboy is in the air!
13 years ago
No comments:
Post a Comment