Friday, October 23, 2009

Day 107: Kitchen cabinets and site cleanup

Friday was a nice light day after 3 intense days of plastering. Alan Dodd from Live Oak Design installed the bases of the kitchen cabinets.

Trevor and I did a bit of site cleanup while Joshua applied waterproofing to the shower floor. We pulled the masking tape and plastic protecting the soffit area to reveal our plaster work up top. We are pleased with the results. Below is a pic of the northwest corner and porch area (please ignore the temporary downspouts). Thanks for reading. I appreciate your comments.