Day 77: Earth moving, part 2

Steve, who we have not seen since the first week of the project, was back Wednesday to operate the backhoe. He started to backfill trenches on the north and east walls.


Steve also made trenches for the French drain and gutter downspout drain lines along the south wall. Trevor installed the 4" diameter corrugated drain lines.