This is the type of panel that would be installed on roof with flat sections. In the second step, the panel was run through a panel curver that stretched both vertical ribs in the panel to add the curvature necessary to fit on my curved roof – see vid below.
So a pile of flat panels like this:


- Marty sprayed the wood in the unfinished eaves with a homebrewed concoction that should reduce the potential for termite infestation in the roof lumber
- Trevor connected an extension to the existing level spreader
- Justin framed up the interior walls of the closet
- Carlos completed the fire sprinkler installation
Look for one solution that solves 2 or more problems. I have procrastinated planting seeds over an old backfilled trench for weeks because the soil was full of rocks that needed to be removed. When Trevor connected the level spreader today, it was obvious that he needed plenty of rocks to backfill the trench effectively. Trevor and I scoured the old backfilled trench area to collect rocks. We used these rocks to backfill the level spreader trench. Now the old backfilled trench where I want to seed is free of rocks. This was also a great use of on site resources. Thanks for reading. I appreciate your comments.