Tuesday, September 29, 2009

Day 91: Plaster preparation and shower enclosure

In the continuing saga of plaster preparation, Trevor started to set up scaffolding along the south and west walls. I applied masking tape and plastic sheet to the interior of all windows and all doors except one.

Trevor and Raphael installed HardieBacker 500 board to the shower enclosure. This material will support the shower tiles. Below is a pic looking at the south and west walls of the enclosure. Thanks for reading. Please feel free to leave a comment.

Monday, September 28, 2009

Day 90: Plaster preparation

We did more plaster preparation tasks again Monday.
  • Joshua completed installing diamond mesh metal lath around the interior window frames
  • I applied masking tape and protective paper to 2 ledgers to prevent plaster contamination
  • Trevor set up scaffolding along the east wall
  • Trevor applied masking tape and plastic sheet to the exterior of the east windows and soffit
Here is a pic of the east wall almost ready for plastering

The spiral staircase from Stocklin Iron in Santa Rosa, CA was delivered today.

Thanks for reading. I enjoy reading your comments.