Thursday, July 9, 2009

Day 42: Wood framing, continued

The wall separating the family room from the bedroom and bathroom was built today – see pic below. The wide opening to the left frames the bathroom door. The wide opening to the right frames the bedroom door. The framing between the doors is part of a structural shear wall.

We also assembled all of the floor joists for the loft above the bedroom, bathroom and closet – see pic below.

I will continue watering the porch slab for the next few days to help it cure slower.

Cool fact:
The full moon nearest the summer solstice follows almost the same path in the sky that the sun follows on the winter solstice (and vice versa). Last night was a full moon near the summer solstice, but not the nearest. The full moon on June 7th was closer by 4 days. I was up during the middle of the night and took some long exposure photographs. The first one is of the moon low in the southern sky – right about where the sun will be around noon on December 21st.

The following pic looks into the home through the big sliding glass door opening.

The large rectangle of light on the floor represents about how far sunlight will penetrate into the family room at noon on December 21st. The 3 smaller rectangles of light creeping up the back wall are from the window over the sliding glass door. You can predict daylight sun penetration into rooms for any time of any day of the year using 3D CAD modeling software. I think it is more fun to see it in action on the real home.

I'll close with a pic of Justin, Joshua and Mike - the framing crew enjoying a brew in the loft at the end of day 42. Thanks for reading. I enjoy your comments.

Wednesday, July 8, 2009

Day 41: Wood framing

The interior walls for the bedroom, bathroom and closet in my home are of wood frame construction. The ceiling framing over these rooms functions as the floor framing for the loft above. Hayward Lumber delivered a beautiful load of framing lumber in the morning – see vid below.



We started framing the wall separating the family room from the bedroom and bathroom. We also attached joist hangers to the east wall ledger – see pic below.

I watered the porch slab again at the end of the day to help it cure properly.

Green comment for today:
Please purchase Forest Stewardship Council (FSC) certified material if you need new lumber for your project. The FSC helps ensure that lumber is harvested in a sustainable manner. Generations from now, the same forest that produced my wood will still be able to produce wood for building. The pic below shows the FSC stamp on a 2X4.

Thanks for reading. Leave a comment if you like.

Tuesday, July 7, 2009

Day 40: Wall top plates and ledgers

Today we cleaned up after wall lift #3. We spent the remainder of the day installing wall top plates – seen in the following pic.

The top plates are 2X10 inch pressure treated boards. They are attached through J-bolts to the top of the wall all the way around the perimeter of the home. The roof will be securely mounted to the top plates.

We also installed 2 ledgers for the loft to the north and south walls. I watered the porch slab at the end of the day to help it cure properly.

Thanks for reading. I appreciate your comments.

Wednesday, June 17, 2009

Day 27: Preparing for a lift

Today we prepared the walls for the first grout lift. Grout fills the interconnected horizontal and vertical network of cells inside the APEX blocks creating the building structure once the concrete is cured. A lift is the height the grout will be poured at one time. In this case, the lift is 5 courses (approximately 80 ionches). The grout is a thin concrete mix and can leak out through holes and gaps in the walls and bucks. The grout applies hydrostatic pressure on the walls and bucks. This pressure increases towards the bottom of the wall just as water pressure against your body increases the deeper you dive. Corners and thin areas of APEX block are most vulnerable to a phenomenon called blowout – when the grout fractures a portion of the wall material and begins gushing from the opening. We want to do everything we can to avoid blowouts. Some of the things that were completed today:
  • Plumbing vents and drains that penetrated partially into APEX grout cells were surrounded with foam, sealed and supported so that grout would not leak and the plumbing would be accessible in the future.
  • Small wooden forms were installed to properly locate 2 beam support brackets that must be cast into the grout during this lift.
  • Threaded rods were cut and placed into the window and door buck holes drilled yesterday.
  • Walls were shored up after ensuring they were vertical.
  • Made a final check to ensure window and door bucks were level and located properly in the openings.
  • All 6 exterior corners were shored up with a frame after ensuring that the walls were vertical.
  • Holes were drilled through the exterior 2 inch thick skin of APEX block under window openings to provide access for the concrete pump hose. All wall cells will be filled from the top of the 5th course of block, but these additional holes will ensure that grout is placed under the window openings.
  • Gaps around door and window openings and any gaps in the APEX block wall larger than about ¼ inch were filled with closed cell spray foam insulation. This material expands several times its size after being sprayed from the canister and fills the gap to prevent grout leaks.
Following are a couple pics from the end of day 27.


Thanks for reading. I appreciate your comments.