Showing posts with label Osmo Polyx-Oil. Show all posts
Showing posts with label Osmo Polyx-Oil. Show all posts

Monday, December 14, 2009

Day 140 & 141: Wood floor and other details

Last Friday, Joshua and I finished sanding the loft floor. On Saturday, Cindy and I cleaned up the house and applied a first coat of Osmo Polyx-Oil finish to the floor. Below is a pic taken from the spiral staircase. The floor is smooth and no longer gray and oxidized, but still retains much of the character from that old Oregon sawmill.

On Friday Justin completed some finish details like pocket door hardware, door strike plates and closet shelves. Below is a pic of the simple closet arrangement. Thanks for reading. I appreciate your comments.

Monday, November 16, 2009

Day 123: More finishes and heating

On Monday, Joshua started applying grout between the shower tiles. The pic below shows a portion of the south shower wall with grout completed. As awesome as the shower looked on Friday, it looks even better today with grout.

Alan applied Osmo Polyx-Oil finish to kitchen cabinet doors. I continued working on the water and space heating system in the utility room. Thanks for reading. I enjoy reading your comments.